The side-return extension has reshaped half the Victorian terraces in E8, and it is a brutal project to clean after. The old rear wall comes down, a steel goes in, the kitchen moves, a roof lantern appears, and for three or four months the back of the house is open to the weather. What settles inside is not only plaster and brick dust but soil from the garden, soot from the old flue, and grit blown in off the street, all ground together into whatever floor was there before.
Dust that gets under the house
Terraces here sit on suspended timber floors with a ventilated void underneath, and during a structural job that void fills with debris through every lifted board. It matters because the void is connected to the living space by the gaps between boards, and warm air rising through them brings the fine material back up into the room for months. Part of a thorough job is extracting along the joints and, where boards have been lifted and relaid, clearing beneath them before they go back down. Air bricks along the rear elevation are the other thing to check, since they are routinely blocked with mortar during a build and the void then stops ventilating properly.
Steel, brick and the newly exposed wall
Exposed brickwork and a raw steel beam are popular finishes and neither likes a standard clean. Soot-blackened London stock brick releases carbon when it is wetted, so it streaks; a waxed or oiled steel will mark under a degreaser. Both are treated dry first, with fine brushing and extraction, and anything wet is tested on a low corner. Lime mortar repointing done during the works also leaves a bloom that must be allowed to dry and then brushed rather than washed.
Roof lanterns and bifold thresholds
Glass laid nearly flat collects everything - mortar splash, silicone, a summer of pollen - and it cannot be reached from inside a finished room without care. Bifold and slider tracks fill with grit during a build, and a single stone in a runner will destroy a roller set within a year. Tracks are vacuumed, drainage channels cleared, and the threshold weep holes checked, because a blocked weep is how a new set of doors starts leaking into the new floor.
Clearing the garden and the waste
Rear access in a terrace usually runs through the house, so everything that came out went past the front door and much of it is still stacked in the garden. Broken brick, old plaster, packaging and a cement-crusted mixer are not cleaning-crew work, and a booked removal through waste removal for flats in Bethnal Green clears them under the duty-of-care rules a carrier has to follow. Getting that done first turns a difficult clean into a straightforward one.
Finishing off and fixing what shows
Once the dust has gone, the last details surface: a cupboard door that catches on a new floor, sealant that never got tooled, a shelf bracket never refitted, a smoke alarm cover hanging loose. Those are a short visit from our nearby specialists rather than a return from the builder. Carpeted bedrooms upstairs, which nobody worked in but everybody walked through, hold construction grit in the pile and come back properly with our specialists in the area. Apartment projects further down river are run through our after builders cleaning service in Canary Wharf by the same teams.
Scope and sequencing
The clean is booked after the decorator, not before, and the scope should cover the whole house rather than the extension, because the dust certainly did. Useful things to confirm at booking: whether internal glass and the lantern are included, whether the garden and side return are part of it, and whether floors are finished or still protected. Charging is on team hours and crew size, which is why the length of the build is a more relevant question than the square metres added. What is generally included is set out on more about this service.